| |
|
|
|
|
|
|
| |
Sky Lakes Cancer Treatment Center
Klamath Falls, OR |
| ZCS is the engineer of record for this $1.5 million project. Responsibilities included structural analysis and design of all primary and secondary structural systems for a second story addition that is structurally independent from the existing first story. Challenges included implementation of the design without disruption of the first floor operation. |
| |
| |
|
|